Srps En 13670 May 2026

Before any concrete is poured, the executor must establish a Quality Management Plan (QMP). This plan must detail:

The standard demands that the execution manager (responsible contractor) and the supervisor (independent or client representative) work in tandem. All checklists must be signed and archived for at least 10 years in Serbia.

Clients and investors increasingly demand that projects comply with EN standards. Compliance means fewer defects, lower maintenance costs, and longer service life. srps en 13670

| Clause | Topic | |--------|-------| | 4 | Execution classes (EC1 to EC4) | | 5 | Formwork | | 6 | Reinforcement | | 7 | Concreting | | 8 | Curing | | 9 | Tolerances | | 10 | Inspection & testing |

Step 1: Surface Cleaning

Step 2: Removal of Defective Concrete

Step 3: Roughening (for Bond)

Step 4: Saturation (Pre-wetting)

  • Used together with SRPS EN 13670/NA (National Annex for Serbia) – which contains specific climate, material, and practice adjustments.